Technology

Standards explained

What each standard covers, and what it changes in a purchase order.

GB/T 25045-2010

Basalt fiber untwisted roving

Defines diameter, linear density, moisture and sizing requirements for roving.

In a purchase order

The tex and diameter you order must be a declared code, not an approximate range.

JT/T 776.1-2010

Basalt fiber chopped strand for highway engineering

Covers chopped strand used in asphalt and cement concrete for road works.

In a purchase order

Dosage and dispersion are checked against the mix design, not the fiber alone.

JT/T 776.2-2010

Basalt fiber unidirectional fabric

Unidirectional fabric for structural strengthening in highway works.

In a purchase order

Areal weight, width and tensile direction must be stated on the delivery document.

JT/T 776.3-2010

Basalt fiber geogrid for highway engineering

Geogrid tensile strength, elongation and mesh geometry.

In a purchase order

Grade selection follows the traffic load and subgrade condition.

JT/T 776.4-2010

Basalt fiber composite rebar

Rebar geometry, tensile and bond requirements for highway structures.

In a purchase order

Design values come from the standard plus the project technical agreement.

GB/T 23265-2009

Chopped basalt fiber for cement concrete and mortar

Fiber for cementitious mixes, including alkali resistance requirements.

In a purchase order

Alkali retention and dosage determine the crack-control result.

GB 50608-2020

Technical code for FRP in construction

Design and application of fiber reinforced polymer in building structures.

In a purchase order

The governing document for structural use of composite rebar and grid.

GB/T 36262-2018

FRP grid for structural engineering

Grid tensile capacity, elongation and node integrity.

In a purchase order

Grade is chosen by required kN/m, then width and mesh follow.

JT/T 533-2020

Fiber for asphalt pavement

Fiber properties and test methods for asphalt mixes.

In a purchase order

Oil film rate and heat resistance retention predict field dispersion.

A standard is not a guarantee

A standard defines how a property is tested and what a supplier must declare. The value that applies to your delivery is the one written into the technical agreement and confirmed by the mill test report. Ask for both.

Reply within 24 hours on business days